The Port Angeles Tunnel Project

George Peterson believes Port Angeles should be a true port city again: a place that builds for the sea and connects the whole Salish Sea. His vision is a cruise and tunnel hub on the old Rayonier waterfront, a green factory district on the McKinley mill site, a reimagined Ediz Hook with a full-length seawall and promenade, and a network of tunnels that starts here. This page shows that vision on real terrain and imagery, next to what the public record says.

Federal and tribal sources describe Port Angeles Harbor as the largest natural deep-water harbor on the U.S. West Coast, with depths over 90 feet near its eastern end, sheltered by the 2.5-mile spit of Ediz Hook. The Port of Port Angeles calls itself the first full-service port available to ships coming into the Strait of Juan de Fuca.

George believes that makes Port Angeles one of the finest natural ports anywhere, and that the town has spent too long treating its waterfront as a place where mills used to be. In his view the harbor's depth and shelter, two large former mill sites, and the open water to Victoria, the San Juans and Puget Sound add up to a port city that has not been finished yet.

Map of Ediz Hook and Port Angeles Harbor with the concept seawall promenade on the Hook, the two former mill sites and the tunnel portal concept
George's concept drawn in code on USDA NAIP imagery with OpenStreetMap features: the seawall promenade along the Hook's north shore, the former McKinley and Rayonier mill sites, and the tunnel portal concept. Concept only, not engineered.

George sees the former Rayonier mill on the east waterfront as the front door of the city: the cruise terminal, the main port, and the hub where the tunnels begin. The old creosote dock and jetty come out under the state cleanup, and a new cruise pier on clean piles takes their place in the same spot, with a public promenade on top, in the spirit of City Pier downtown, extending the waterfront walk. Any acquisition would help fund and speed up the cleanup and habitat mitigation, under the state's cleanup oversight. The shoreline is restored with native planting, along with the Ennis Creek estuary. Passengers step off the ships onto a plaza at grade and into autonomous taxis waiting at the curb, with no climb and no shuttle bus.

Concept rendering. The former Rayonier mill site from over the harbor.
Today. The former Rayonier mill site from over the harbor.
TodayConcept
The former Rayonier mill site. Today, with the derelict creosote dock and jetty. In the concept, a new cruise pier on clean piles in the same spot, a public promenade on top extending the waterfront walk, and a restored shoreline. Same camera, real USGS 3DEP terrain and USDA NAIP imagery. Concept rendering, not an approved plan.
Concept rendering. The Rayonier dock and shoreline from the water.
Today. The Rayonier dock and shoreline from the water.
TodayConcept
Closer in. Today, the derelict dock and jetty. In the concept, the cruise pier with a public promenade on top, in the spirit of City Pier downtown, and the waterfront walk continuing toward downtown. The ship is generic. Concept rendering, not an approved plan.
Concept rendering of the Rayonier tunnel hub entrance, tucked under a planted landform, with a glazed entrance under a cedar soffit and autonomous taxis at the curb.
The hub entrance, tucked under a planted landform: a glazed entrance under a cedar soffit, autonomous taxis at the curb, a plaza at grade and native planting. Rendered in Blender. Concept rendering, not a final design.
Concept rendering of the tunnel hub concourse: a cedar-slat vault with a daylight slot, benches, small maples and autonomous taxis behind a glass screen.
Inside the concourse: a cedar-slat vault with a daylight slot along the crown, benches and small native maples, and autonomous taxis waiting behind a glass screen. Rendered in Blender. Concept rendering, not a final design.

From the hub, the three concept lines of the Salish Tunnel system start. The West End line runs west to Joyce and Clallam Bay and ends at Neah Bay, Makah connection. East, a shared trunk runs to Sequim at Port Williams and on to Port Townsend, where the Olympia line turns south under Hood Canal and the Seattle line runs on to Edmonds and downtown Seattle. All three are drawn as one continuous tunnel joined at the hub, with no breaks between stops.

The Washington Department of Ecology oversees the Rayonier cleanup, now in the "design the cleanup" phase. Ecology expects soil cleanup to take no more than 7 years and groundwater and sediment cleanup no more than 10, and says future land use is up to the owner and local government. A new pier, a terminal, a plaza and portals fit George's plan for the site well, since they are new construction that works with the cleanup design rather than digging a basin.

The working name for the former McKinley mill site at the base of Ediz Hook is Strait Gardens: a green waterfront district that is also a working yard. It has two jobs.

The first is the casting yard. Tunnel sections are built in a graving dock along the water, floated out, towed to their place and sunk into a trench on the seabed. That is how the world's big immersed tunnels have been made: Denmark built a purpose-built factory in Copenhagen North Harbour for the Øresund tunnel, and the Fehmarnbelt tunnel between Denmark and Germany is being cast at a factory at Rødbyhavn with six production lines and basins nearly 36 feet deep.

The second is an advanced factory campus. George's vision is a robot factory, for example building humanoid robots like Optimus, and parts for Starbase programs, alongside a factory that builds and services tunnel-boring machines for the yard next door. The halls are long, low and high-bayed, with green roofs, glass and timber, and they connect straight to rail, the tunnels and the port. Tesla and SpaceX are not involved and have not endorsed any of this.

The look takes its cue from Singapore's garden city: green roofs, vertical greenery, garden towers around a restored lagoon, park corridors running between the halls, and a restored shoreline with a public promenade along the Strait.

Concept rendering. The former mill site from over the Strait: today large industrial buildings; in the concept a long glass-roofed factory hall and a cultural center among trees, meadow and planted pond edges, behind a seawall with a planted crest.
Today. The former mill site from over the Strait: today large industrial buildings; in the concept a long glass-roofed factory hall and a cultural center among trees, meadow and planted pond edges, behind a seawall with a planted crest.
TodayConcept
The mill site from over the Strait, today and as a concept: a long factory hall under a glass barrel roof, a cultural center, trees, meadow and planted wetland edges, and a seawall with a planted crest. Everything stays inside the former mill site. Rendered on public terrain, aerial imagery and OpenStreetMap buildings. Concept rendering, not a final design.
Concept rendering. The former mill site from above the harbor: today mill buildings and tanks; in the concept a glass-roofed factory hall and a cultural center set in park and trees.
Today. The former mill site from above the harbor: today mill buildings and tanks; in the concept a glass-roofed factory hall and a cultural center set in park and trees.
TodayConcept
From above the harbor, today and as a concept. Sizes and layout are illustrative only. Concept rendering, not a final design.
Dusk view from over the Strait: the campus halls glow and warm, downward-facing street lights follow Marine Drive to downtown.
The campus at dusk, with Marine Drive lit to First Street by warm, downward-facing street lights. Lighting, buildings and traffic are illustrative. Concept rendering, not a final design.
Night view from the same point: the campus halls glow and the lit line of Marine Drive curves along the dark harbor toward downtown.
The same view at night. Street lights point down, so the road is lit and the sky stays dark. Concept rendering, not a final design.

The concept plan below shows the layout of the yard, the halls and the green district. More on the Mill site page.

  1. Step 1

    Cast on shore

    Sections are cast in concrete, or built in steel, at a yard on the old mill waterfront.

  2. Step 2

    Float out

    Ends are sealed with temporary bulkheads, the basin or dock is flooded, and the section floats.

  3. Step 3

    Tow

    Tugs tow the floating section across the harbor to its place on the route.

  4. Step 4

    Sink and join

    Ballast lowers it into a dredged trench; water pressure seals the joint to the last section.

How an immersed tunnel section goes from the mill yard to the seabed. Simplified from the Øresund, Fehmarnbelt and Ted Williams Tunnel methods. Not to scale.
Concept site plan of the mill site with the graving dock, casting halls, factory halls, lagoon and green district, and Sichuan Village, a landscaped park with a culture center, on the block beside Marine Drive
Concept plan on the mill-site footprint from OpenStreetMap, with the lagoon traced from USDA NAIP imagery. Scale in feet. Layout is illustrative.

Washington has worked on this waterfront before, and the lesson matters. The state began a graving yard at the base of Ediz Hook to build Hood Canal Bridge pontoons and stopped in December 2004 after Tse-whit-zen, a Lower Elwha Klallam village and burial ground, was uncovered there. George believes any yard on this waterfront should start by inviting the Lower Elwha Klallam Tribe to the table.

Building for the world

Long term, George believes Port Angeles could make tunnel elements and ship them to projects around the Pacific, the way shipyards export hulls. There is a partial precedent: the steel sections of Boston's Ted Williams Tunnel were built in Baltimore and carried about 400 miles by sea. A yard that first serves the network's own tunnel lines is the natural first step toward that larger idea.

Latest news

What is happening at the mill site now, from public records and local reporting, newest first.

Latest news: McKinley mill site

Last checked

  1. City CouncilUpcoming

    Candelaria scheduled to brief the City Council

    The October 20 Port Angeles City Council agenda lists a presentation by Candelaria, described as the potential purchaser of the McKinley mill, as an information-only item. No Council action is listed.

    Source: City of Port Angeles, City Council agenda, October 20, 2026 (item I-1)

  2. News

    EDC director describes a small data center idea at the mill

    At a County candidate forum, the Clallam EDC director described the buyer's idea as a small data center of under 2,000 square feet that would use no water, and said the moratorium came before any permits were submitted. This is a secondhand description, not a filed proposal.

    Source: Peninsula Daily News

  3. City Council

    Candelaria representative and supporters speak at Council

    Draft minutes of the October 6 Council meeting record that a Candelaria Industries representative spoke during public comment about small modular computer containers and their water use and noise. Several other speakers, including the Clallam EDC director, urged the Council to work with or explore the company's proposal.

    Source: City of Port Angeles, City Council agenda packet, October 20, 2026 (minutes of October 6)

  4. Port

    Port CEO asks Council for workshops on the mill site

    At the moratorium hearing, Port of Port Angeles CEO Paul Jarkiewicz asked the Council for a workshop or two to understand what was intended for the mill site. Other speakers asked for permanent limits on data centers.

    Source: Peninsula Daily News

  5. News

    Moratorium stays unchanged as Council outlines next rules

    Radio Pacific reported that the Council kept the six-month pause as is, and that a Council member suggested future rules regulate the impacts of large resource users rather than defining data centers. The Planning Commission and Utility Advisory Committee are expected to help draft recommendations.

    Source: Radio Pacific (myclallamcounty.com)

Compiled automatically from public sources: City of Port Angeles meeting records, the Port, Clallam County, the buyer's own statements, and local news. Summaries are our own. Third Harvest is not affiliated with any of the parties named here.

All 14 items →

There are two main ways to put a tunnel under water, and George considers the difference the key technical point of the whole project.

Immersed tubes are prefabricated sections laid in a trench dredged in the seabed, joined underwater, then backfilled and armored. Øresund, Fehmarnbelt, Korea's Busan-Geoje link, the Hong Kong-Zhuhai-Macao crossing and BART's Transbay Tube under San Francisco Bay were built this way.

Bored tunnels are dug through rock or soil beneath the seabed by a tunnel boring machine, like the Channel Tunnel or Norway's Rogfast.

George's direction is that most Salish Sea tunnels should be immersed tubes, with boring used only where a tunnel arrives at a port: short bored sections that carry the tube under the shoreline and the waterfront to a portal on land.

Portal on landPortal on landBored underthe waterfrontBored underthe waterfrontOpen waterImmersed tube sections in a dredged trench
George's approach in one picture: immersed tube sections across open water, with short bored sections only where the tunnel arrives at each port. Schematic, not to scale, not engineered.
Side-by-side diagram of an immersed tube in a seabed trench and a bored tunnel deep under the seabed
Schematic, not to scale. Drawn in code from ITA-AITES, Femern, Getlink and Rogfast sources.

He also believes a specialist tunneling contractor should be hired for that portal boring. No contractor has been chosen or contacted. George's split, immersed tubes by marine contractors and boring only at the landings, keeps each builder on the kind of work it already does.

The industry body ITA-AITES says immersed tunnels are typically built in about 16 to 100 feet of water, and the deepest built are about 200 feet (Marmaray, Istanbul), 160 feet (Busan-Geoje) and 150 feet (Hong Kong-Zhuhai-Macao). The harbor approaches fit that range well.

George's plan takes US 101 through-traffic and freight under downtown in two tunnels, one under Front Street and one under First Street. Both run west and connect to the existing US 101 truck route further down, the SR 117 Tumwater Truck Route, as one continuous underground freight path, so trucks never surface downtown.

Above them, Front Street and the core become a green corridor with safe crossings, local and delivery access, and a clear emergency-access lane.

Cutaway diagram of one tunnel bore under a green corridor on Front or First Street
One bore under the downtown green corridor, one direction per bore, with semi clearance and a raised emergency walkway. Concept, not engineered.
Driver's view inside the Front Street tunnel, westbound toward the SR 117 truck route
Inside the Front Street tunnel, westbound toward the SR 117 truck route. Concept, not engineered.
Map of the Front Street and First Street tunnels under downtown Port Angeles joining the SR 117 truck route
Front Street and First Street tunnels joining the existing SR 117 Tumwater Truck Route. Concept routes, not engineered alignments.

Ediz Hook already protects the harbor. The U.S. Army Corps of Engineers has kept it armored with stone and fresh cobble since 1977, because bluff armoring and the old Elwha dams starved the spit of the sediment that used to rebuild it.

George's idea is to rebuild the whole north shore of the Hook as an engineered tsunami seawall that doubles as a promenade for walking and biking, kept low and green so people still see the water. It runs the full length of the Hook, through the Coast Guard Air Station and the Navy's pier to the tip. His reasoning is simple: the wall protects the base, and carrying it to the end makes the whole Hook permanently stronger. The federal section is federal land, so that stretch needs federal agreement.

Both shores are restored with native planting: shore pine, Douglas-fir and native meadow on the bay side and behind the wall, with low native grasses only near the airfield.

Port Angeles Harbor at dawn from over the Strait, with Ediz Hook in the foreground right, the town and the Olympic Mountains behind. Concept rendering.
Dawn over the Strait, looking south-west into the harbor. Along the Hook's north shore, a low seawall promenade with native planting on both sides. This view shows it from the base of the Hook to the edge of the Coast Guard section; the plan carries it on to the tip. Rendered in Blender on USGS 3DEP terrain, NOAA NCEI seabed, USDA NAIP imagery and OpenStreetMap buildings. Concept rendering, not a final design. The full run, base to tip, is on the Ediz Hook seawall page.
Concept rendering of Ediz Hook at blue hour, with native trees along the spit and warm pools of downward street light on the road.
Ediz Hook at blue hour: native trees along the spit and warm pools of downward-facing street light on Ediz Hook Road. Rendered in Blender on real terrain and imagery. Concept rendering, not a final design.
Schematic cross-section of a vegetated seawall promenade on Ediz Hook with a walk and bike deck
Not to scale. The red line is the Washington Geological Survey's modeled maximum amplitude at its "Port Angeles" model point, shown for reference.

The models he points to are Dutch sea defenses you can stroll on: Katwijk hides its dike inside widened dunes, and Scheveningen built its sea defense into a boulevard with cycle paths. Seattle's Elliott Bay seawall shows the habitat side: a textured face, a light-passing sidewalk and a habitat bench, where observers counted 10,000 juvenile salmon in a single day in May 2018. Design guidance exists for this work: ASCE 7 has carried a tsunami chapter since 2016, and FEMA P-646 covers structures people can climb onto to escape a tsunami.

George calls the network the Salish Tunnel system, and he sees the Rayonier hub as its start: three lines, drawn as one continuous tunnel with no breaks between stops. The West End line runs west to Joyce, about 13 miles from the hub, then about 26 miles to Clallam Bay, and about 18 miles more to Neah Bay, Makah connection, the last stop: about 57 miles in all. East, a shared trunk runs about 24 miles to Sequim at Port Williams Beach and about 17 miles more to Port Townsend. From Port Townsend the Olympia line runs about 108 miles under Hood Canal to Olympia, about 149 miles from the hub. The Seattle line runs about 31 miles subsea through Admiralty Inlet to Edmonds and about 17 miles more under the Sound to downtown Seattle, about 89 miles from the hub. These are concept routes, not engineered alignments.

LineStretchAlong the line
West EndRayonier hub to Joyceabout 13 mi
West EndJoyce to Clallam Bayabout 26 mi
West EndClallam Bay to Neah Bay, Makah connectionabout 18 mi
West EndRayonier hub to Neah Bay, Makah connection, in allabout 57 mi
East trunkRayonier hub to Sequim, Port Williamsabout 24 mi
East trunkSequim to Port Townsendabout 17 mi
OlympiaPort Townsend to Olympia, under Hood Canalabout 108 mi
OlympiaRayonier hub to Olympia, in allabout 149 mi
SeattlePort Townsend to Edmonds, subsea through Admiralty Inletabout 31 mi
SeattleEdmonds to downtown Seattle, subsea under the Soundabout 17 mi
SeattleRayonier hub to downtown Seattle, in allabout 89 mi
Miles measured along the drawn concept line. One continuous tunnel, with all routes joined at the Rayonier hub and no breaks between stops. Concept routes, not engineered alignments.
Concept map, The Salish Tunnel system: one continuous tunnel network from the Rayonier hub in Port Angeles, west to Joyce and Clallam Bay, ending at Neah Bay, Makah connection, and east to Sequim and Port Townsend, where the Olympia line runs under Hood Canal and the Seattle line runs under Admiralty Inlet to Edmonds and Seattle
Miles measured along the drawn line. Lines are schematic: alignment, depth and stop sites are illustrative only. Basemap: Esri World Ocean Base and World Terrain Base. Concept rendering, not a final design.

The land and coastal legs come first: west to Neah Bay, and east to Sequim and Port Townsend. The crossing from Port Townsend to Edmonds goes under Admiralty Inlet, where NOAA puts the sill near 210 feet, and then under deeper water toward Edmonds.

George believes some tunnel sections could double as data centers cooled by the sea, with dry walk-in access for maintenance. Underwater data centers are real: Microsoft's Project Natick ran 864 servers in a sealed pod off Scotland from 2018 to 2020 and reported one-eighth the failure rate of a land-based group. China's HiCloud runs commercial subsea modules off Hainan and Shanghai, and Norway cools mountain data halls with cold fjord water.

Cross-section of a typical immersed road and rail element beside a concept data-hall element
Left: a typical road and rail immersed element. Right: George's concept for a separate data-hall element.

In George's design the data halls sit in their own fire-sealed elements beside the traffic tubes, since fire codes for road and rail tunnels (NFPA 502 and NFPA 130) keep the escape galleries clear for people.

For George's vision to move from idea to project, these pieces line up:

  • The tribes are partners George would invite. The Lower Elwha Klallam Tribe at Tse-whit-zen, the base of the Hook and the Rayonier waterfront, and the treaty tribes whose fishing grounds these routes cross.
  • The waterfront is available. The Rayonier cleanup design and its owner, and the McKinley site's new owner.
  • Federal agreement for the seawall's run through the Coast Guard Air Station and the Navy's pier.
  • The Corps, the City and the Port agree on what Ediz Hook becomes, with site-specific tsunami modeling setting the wall's height.
  • The seabed is surveyed so real borings decide where tubes go and where boring is needed.
  • A builder is chosen. George believes a specialist tunneling contractor should do the portal boring. None has been contacted, and there is no agreement of any kind.