Vision · Concept
Mill flip
George's concept: the former McKinley mill site at the base of Ediz Hook becomes the factory that builds the tunnel tubes. Each tube would carry car lanes below and, in a sealed chamber above, racks of self-contained data pods with their own service walkway and rail cart. This is a vision, not a plan: nothing here has been engineered, permitted, funded or agreed with anyone.

Why sealed pods
- Microsoft's Project Natick put a sealed data center on the seabed: a vessel about 40 feet long and 9 feet across holding 12 racks and 864 servers, filled with dry nitrogen at one atmosphere, and planned to run up to five years without maintenance.[Microsoft Research]
- It was deployed 117 feet deep off Scotland's Orkney Islands in spring 2018 and retrieved in the summer of 2020.[Microsoft]
- Microsoft reported that the sealed servers failed at one-eighth the rate of a matching group on land.[Microsoft Research; Microsoft]
- Data centers already run inside rock: Lefdal Mine in Norway keeps its IT spaces about 2,300 feet inside a mountain, Green Mountain uses former NATO ammunition halls cooled by fjord water from about 330 feet down, and Bahnhof's Pionen in Stockholm sits in a former Cold War civil-defence shelter about 100 feet under the bedrock.[Lefdal; Green Mountain; Bahnhof]
Concept-level caveat: We found no data center operating inside a road tunnel today, so this is a new combination of proven building blocks. Any version would need its own engineering, fire separation, environmental and tribal review, and permits.
The 3D scenes use USGS 3D Elevation Program terrain, USDA NAIP aerial imagery and OpenStreetMap streets and buildings, with procedural trees and generic architecture.[USGS 3DEP; USDA NAIP; OpenStreetMap]
Quiet termini
Where a tube comes ashore, the idea is that most of it stays out of sight: a portal tucked into the ground or a hillside, a short drive, and one low building under a planted roof, with the forest kept around it.


The mill site as a campus
The vision for the mill site itself: a glass tube factory at the heart, glass pavilions with planted terraces along a central walk, and the rest given back to native trees, meadow and the existing ponds as a wetland park with a boardwalk. On the harbor side, a cultural center called Sichuan village takes the form of a longhouse scaled up to stadium proportions, and a seawall with a planted crest runs along the Strait. Everything stays inside the former mill site.






The Salish Tunnel system: flat map
The Salish Tunnel system has three concept lines that meet at the Rayonier hub, drawn as one continuous tunnel with no breaks between stops. The Olympia and Seattle lines share the east trunk as far as Port Townsend:
- West End: Rayonier hub to Joyce (about 13 mi), then Clallam Bay (about 26 mi), ending at Neah Bay, Makah connection (about 18 mi), about 57 mi in all
- East trunk: Rayonier hub to Sequim at Port Williams (about 24 mi), then Port Townsend (about 17 mi)
- Olympia: Port Townsend to Olympia under Hood Canal (about 108 mi), about 149 mi from the hub
- Seattle: Port Townsend to Edmonds, subsea through Admiralty Inlet (about 31 mi), then under the Sound to downtown Seattle (about 17 mi), about 89 mi from the hub

Tubes built at the mill site would serve this network, which starts at the Rayonier hub in Port Angeles. Lines are schematic, not routes anyone has studied, engineered or approved.
More on the hub on the Rayonier hub page, and on the mill site itself on the Mill site page.
Concept only. Nothing on this page has been approved by, or agreed with, any agency, tribe or company.